Case Study 4
What our customer was looking for:
- A solution to the problem of component failure in laboratory gas conditioning equipment.
- A supplier to provide long-term security of supply to replace local machine shops.
- Improved quality of all components to overcome 50% failure rate of final product assembly.
What we provided:
- A solution to the component cracking problem by sourcing material processed differently and introducing an annealing step.
- Detailed component drawings and material specifications for all plastic components.
- Manufacture of 30 plastic components and outsourcing of 20 metal and rubber components.
- Assembly of finished products and stocking of components.
- Plastic alternative to main metal component.
How our customer benefited:
- Improved product service life
- Internal assembly process and component sourcing effort were eliminated.
- 90% on-time delivery performance of different assemblies.
- Internal stock levels reduced.
- Final product assembly failure rate of <1%.